VCU Community Memorial Hospital
Customer: DPR Construction
Architect: SmithGroup, Inc.
Engineer: Leach Wallace Associates
Owner: Virginia Commonwealth University
Year Completed: 2017
Area: 166,700 SF
Market: Commercial
Sector: Healthcare
Contract Amount: $13M
PROJECT DESCRIPTION
ACI designed and constructed pre-manufactured piping, electrical, and wood blocking in a panelized wall system, which was then transported to the site and installed in the patient rooms. Other pre-fabricated efforts on the project included skids and piping for the boiler and chiller plant that were shop-fabricated and shipped fully assembled to the site.
What would normally take months, took only days in the field.
PROJECT HIGHLIGHTS
- 600 TONS of Cooling
- 5 RTU’s – 150,000 CFM
- Prefabricated Med Gas Walls
- Prefabricated Modular Central Utility Plant
- Nearly 300 VAV’s
- 3 Boilers with a Capacity of 9000 MBH
- 100 HP Steam Generator
- LEED Silver Certification